Mississippi mining facility startup
Company: CleanSpark
What the later record shows
Outcome not yet confirmed
The only Mississippi passage gives aggregate capacity (about 63 MW across four cities) as of September 30, 2025. It does not identify the location that was under construction or say when it began operating.
“As of September 30, 2025, our Mississippi facilities have a developed data center infrastructure backed by approximately 63 MW”
2025-11-24 · CleanSpark 10-K filed 2025-11-25 View cached copy (2026-08-31)Live source ↗
Checked October 11, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
One Mississippi location currently under construction expected to begin operation in December 2024
Source (primary)
CleanSpark 10-K filed 2024-12-03 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “One of Mississippi locations is currently under construction and is expected to begin operation in December 2024.”
How we checked this
Checked on October 10, 2026. The cited source supports every part of this claim.
The 10-K states that one Mississippi location is under construction and expected to begin operation in December 2024.
Confirmed in the source:
- One of CleanSpark's Mississippi mining locations was under construction as of September 30, 2024
- That Mississippi location was expected to begin operation in December 2024
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/827876/000095017024132565/clsk-20240930.htm) in full (484,491 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms CleanSpark 10-K filed 2024-12-03
Quote: “One of Mississippi locations is currently under construction and is expected to begin operation in December 2024.”