Wind farm acquisition in Hansford County, Texas
Company: Marathon Digital
The claim, verbatim
Company closed acquisition of a wind farm in Hansford County, Texas featuring 240 megawatts of interconnection capacity and 114 megawatts of nameplate capacity
Source (primary)
Marathon Digital 8-K filed 2025-02-18 (SEC EDGAR, sec_filing)
View cached copy (2026-08-31)Live source ↗
Quote: “closed its previously announced acquisition of a wind farm in Hansford County, Texas, with 240 megawatts of interconnection capacity and 114 megawatts of nameplate wind capacity”
How we checked this
Checked on September 17, 2026. The cited source supports every part of this claim.
MARA Holdings' February 18, 2025 Form 8-K states the company closed its acquisition of a Hansford County, Texas wind farm with 240 MW of interconnection capacity and 114 MW of nameplate wind capacity.
Confirmed in the source:
- MARA Holdings closed an acquisition of a wind farm
- The wind farm is in Hansford County, Texas
- The wind farm has 240 megawatts of interconnection capacity
- The wind farm has 114 megawatts of nameplate wind capacity
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1507605/000149315225007090/form8-k.htm) in full (3,437 characters, retrieved August 31, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Marathon Digital 8-K filed 2025-02-18
Quote: “closed its previously announced acquisition of a wind farm in Hansford County, Texas, with 240 megawatts of interconnection capacity and 114 megawatts of nameplate wind capacity”
confirms marathon-digital 8-K exhibit (ex99-1.htm)
Quote: “has closed its previously announced acquisition of a wind farm in Hansford County, Texas, with 240 megawatts of interconnection capacity”
