Scale to 50 EH/s within 18-24 months
Company: Marathon Digital
What the later record shows
Outcome not yet confirmed
None of the passages report Marathon's total hashrate in EH/s, so whether it reached 50 EH/s by January 2026 cannot be determined; the passages give power capacity in MW/GW and a 2.4 EH miner purchase, not total hashrate.
“Building a Scalable Energy Network Through Strategic Site Expansion 1.3 GW Operational Capacity 1.9 GW Total Capacity”
2026-03-20 · MARA Investor Presentation View cached copy (2026-09-01)Live source ↗Archive.org ↗
“During the quarter we purchased 2.4 EH of next-generation used ASIC miners, still under warranty, at below-market prices, to replace legacy machines”
2026-05-10 · Marathon Digital 10-Q filed 2026-05-11 View cached copy (2026-08-31)Live source ↗
Checked November 15, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
Marathon plans to scale its operations to 50 exahashes of capacity over the next 18-24 months (i.e., by roughly mid-2025 to January 2026).
Source (primary)
marathon-digital 8-K exhibit (ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-14)Live source ↗
Quote: “over the next 18-24 months, scaling our operations to 50 exahashes of capacity”
How we checked this
Checked on November 16, 2026. The cited source supports every part of this claim.
The CEO says Marathon looks forward to scaling to 50 exahashes over the next 18-24 months. Counting from the release date of January 16, 2024, that puts the target at roughly July 2025 to January 2026.
Confirmed in the source:
- Marathon stated an aim to scale its operations to 50 exahashes of capacity
- The stated timeframe is over the next 18-24 months
- The statement was made on January 16, 2024, so the window runs to roughly mid-2025 through January 2026
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1507605/000149315224002346/ex99-1.htm) in full (5,420 characters, retrieved November 14, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms marathon-digital 8-K exhibit (ex99-1.htm)
Quote: “over the next 18-24 months, scaling our operations to 50 exahashes of capacity”