Childress single-site expansion toward 20 EH/s
Company: IREN
What the later record shows
Delivered on time · happened December 31, 2024
By December 31, 2024, the single Childress site had 350MW of data center capacity and about 21.1 EH/s of hashrate capacity. That exceeds the 20 EH/s target by the promised date.
“as of December 31, 2024, has 350MW of data center capacity and hashrate capacity of approximately 21.1 EH/s”
2025-03-19 · iren 8-K exhibit (irenlimited-exx992dec2024x.htm) View cached copy (2026-10-18)Live source ↗
“have commenced construction for Childress Phase 2 (additional 100MW) and Phase 3 (additional 150MW)”
2025-03-19 · IREN 20-F/A filed 2025-03-20 View cached copy (2026-08-31)Live source ↗
Checked November 11, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
The path to 20 EH/s self-mining capacity (from 10 EH/s) is through a single-site expansion at Childress, supported by fixed-price miner contracts and available power.
Source (primary)
iren 8-K exhibit (ef20015356_ex99-2.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-11)Live source ↗
Quote: “Self-mining capacity 20 EH/s Note 1: Refer to key assumptions on page 18 for further detail 1.5 EH/s 6.2 EH/s 10 EH/s Fixed price miner contracts1 Power available Single site expansion (Childress)”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms iren 8-K exhibit (ef20015356_ex99-2.htm)
Quote: “Self-mining capacity 20 EH/s Note 1: Refer to key assumptions on page 18 for further detail 1.5 EH/s 6.2 EH/s 10 EH/s Fixed price miner contracts1 Power available Single site expansion (Childress)”
confirms IREN 20-F/A filed 2025-03-20
Quote: “have commenced construction for Childress Phase 2 (additional 100MW) and Phase 3 (additional 150MW)”
confirms iren 8-K exhibit (irenlimited-exx992dec2024x.htm)
Quote: “as of December 31, 2024, has 350MW of data center capacity and hashrate capacity of approximately 21.1 EH/s”