1.9 GW operational, path to 4.8 GW
Company: Marathon Digital
The claim, verbatim
MARA has about 1.9 GW of operational capacity across nearly 20 sites on four continents, with a clear path to approximately 4.8 GW.
Source (primary)
MARA Holdings Q3 Call: Aims to Secure Two AI/HPC Leases by Year-End, Reduces Total Debt by 37% - KuCoin (-, news_article)
View cached copy (2026-11-10)Live source ↗Archive.org ↗
Quote: “approximately 1.9 GW of operational capacity across nearly 20 sites on four continents, with a clear path to approximately 4.8 GW”
How we checked this
Checked on November 11, 2026. The cited source supports every part of this claim.
The article states the current capacity, its site and continent footprint, and the path to about 4.8 GW.
Confirmed in the source:
- MARA has approximately 1.9 GW of operational capacity
- The capacity is spread across nearly 20 sites on four continents
- MARA has a clear path to approximately 4.8 GW
What we did: Read our cached copy of the publisher (https://www.kucoin.com/news/flash/mara-holdings-q3-call-aims-to-sign-two-ai-hpc-leases-by-year-end-cuts-total-debt-by-37) in full (15,540 characters, retrieved November 10, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms MARA Holdings Q3 Call: Aims to Secure Two AI/HPC Leases by Year-End, Reduces Total Debt by 37% - KuCoin
Quote: “approximately 1.9 GW of operational capacity across nearly 20 sites on four continents, with a clear path to approximately 4.8 GW”