Matagorda classified as ERCOT studied load
Company: Marathon Digital
The claim, verbatim
The Matagorda site was classified as a studied load by ERCOT in the Batch Zero process.
Source (primary)
marathon-digital 8-K exhibit (q326shareholderletter.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-10)Live source ↗
Quote: “The site was recently classified as a studied load by ERCOT in the Batch Zero process”
How we checked this
Checked on November 11, 2026. The cited source supports every part of this claim.
The letter directly states this classification.
Confirmed in the source:
- ERCOT classified the Matagorda site as a studied load in the Batch Zero process
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1507605/000150760526000026/q326shareholderletter.htm) in full (43,591 characters, retrieved November 10, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms marathon-digital 8-K exhibit (q326shareholderletter.htm)
Quote: “The site was recently classified as a studied load by ERCOT in the Batch Zero process”