Starwood JV long-term IT capacity >2.5 GW
Company: Marathon Digital
The claim, verbatim
Pathway to more than 2.5 GW of IT capacity over time through the Starwood JV.
Source (primary)
MARA Investor Presentation (IR page (ir.mara.com), ir_presentation)
View cached copy (2026-11-10)Live source ↗
Quote: “Pathway to more than 2.5 GW of IT capacity over time”
How we checked this
Checked on November 11, 2026. The cited source supports every part of this claim.
The presentation states this pathway on its Starwood joint venture and operations roadmap slides.
Confirmed in the source:
- The Starwood joint venture has a stated pathway to more than 2.5 GW of IT capacity over time.
What we did: Read our cached copy of IR page (ir.mara.com) (https://d1io3yog0oux5.cloudfront.net/_8c69f4357a699e228a85d68890478b48/marathondh/db/417/7571/pdf/MARA+Investor+Presentation_March+2026+%281%29.pdf) in full (26,961 characters, retrieved November 10, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms MARA Investor Presentation
Quote: “Pathway to more than 2.5 GW of IT capacity over time”