Brazoria phase 2 ERCOT load classification pending
Company: CleanSpark
The claim, verbatim
The second 300 MW at Brazoria still awaits ERCOT's determination between base load and studied load.
Source (primary)
Crypto Rally May Change The Case For CleanSpark Stock - Simply Wall St (-, news_article)
View cached copy (2026-11-08)Live source ↗Archive.org ↗
Quote: “while the second 300 MW at Brazoria still awaits the determination between base load and studied load”
How we checked this
Checked on November 9, 2026. The cited source supports part of this claim, but not all of it.
The status is reported only in a reader comment, not in the article itself, and the comment does not say which body makes the determination. The claim states it as fact.
Confirmed in the source:
- A reader comment on the CleanSpark discussion page states that the second 300 MW at Brazoria still awaits the determination between base load and studied load
We could not confirm this from the cited source:
- That the second 300 MW at Brazoria is in fact still awaiting this determination (the page offers only a reader's unverified account)
- That the pending determination is ERCOT's (the comment does not name ERCOT)
That does not mean it is false — only that this source does not establish it, as of the date above. If we find a source that settles it, we will re-check and update this page.
What we did: Read our cached copy of the publisher (https://simplywall.st/stocks/us/software/nasdaq-clsk/cleanspark/news/crypto-rally-may-change-the-case-for-cleanspark-stock) in full (14,025 characters, retrieved November 8, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Crypto Rally May Change The Case For CleanSpark Stock - Simply Wall St
Quote: “while the second 300 MW at Brazoria still awaits the determination between base load and studied load”