Hash rate 10.0 EH/s by Q2 2024
Company: TeraWulf
What the later record shows
Delivered; the record does not say when
Hash rate was about 8.0 EH/s as of May 31, 2024, and the chart shows 10.0 EH/s for 3Q 2024. No passage confirms 10.0 EH/s within Q2 2024.
“As of May 31, 2024, TeraWulf's operational infrastructure capacity comprised 160 MW at the Lake Mariner facility and 50 MW at the Nautilus facility”
2024-06-03 · terawulf 8-K exhibit (wulfmay24opsreportdraft0.htm) View cached copy (2026-11-04)Live source ↗
“0.3 EH/s 2.0 EH/s 3.3 EH/s 5.5 EH/s 10.0 EH/s 9.7 EH/s 12.2 EH/s”
2025-05-08 · terawulf 8-K exhibit (wulfq12025investorpresvf.htm) View cached copy (2026-10-15)Live source ↗
Checked November 8, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
TeraWulf projects total hash rate of 10.0 EH/s in Q2 2024.
Source (primary)
terawulf 8-K exhibit (exhibit992-wulfmarch24in.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-08)Live source ↗
Quote: “10.0 EH/s ... Q2 24E”
How we checked this
Checked on November 9, 2026. The cited source supports every part of this claim.
The Total Hash Rate chart pairs 10.0 EH/s with the Q2 24E period, and the 2024 guidance table uses 10.0 EH/s of total hash rate for the post-halving period.
Confirmed in the source:
- TeraWulf projects total hash rate of 10.0 EH/s in Q2 2024
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1083301/000108330124000066/exhibit992-wulfmarch24in.htm) in full (13,743 characters, retrieved November 8, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms terawulf 8-K exhibit (exhibit992-wulfmarch24in.htm)
Quote: “10.0 EH/s ... Q2 24E”
confirms terawulf 8-K exhibit (wulfq12025investorpresvf.htm)
Quote: “0.3 EH/s 2.0 EH/s 3.3 EH/s 5.5 EH/s 10.0 EH/s 9.7 EH/s 12.2 EH/s”
confirms terawulf 8-K exhibit (wulfmay24opsreportdraft0.htm)
Quote: “As of May 31, 2024, TeraWulf's operational infrastructure capacity comprised 160 MW at the Lake Mariner facility and 50 MW at the Nautilus facility”