550 MW (~28.3 EH/s) deployed by end of 2025
Company: TeraWulf
What the later record shows
The date slipped
As of June 30, 2026, TeraWulf had 145 MW of bitcoin mining capacity energized, with miner buildings being repurposed for HPC. That is far below 550 MW / ~28.3 EH/s by end of 2025.
“has energized 145 MW of capacity across three buildings and supporting infrastructure at the site”
2026-08-04 · TeraWulf 10-Q filed 2026-08-05 View cached copy (2026-08-31)Live source ↗
“During the six months ended June 30, 2026, two miner buildings were repurposed or placed out of service to support the HPC development”
2026-08-04 · TeraWulf 10-Q filed 2026-08-05 View cached copy (2026-08-31)Live source ↗
Checked November 8, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
TeraWulf plans to scale to 550 MW, equivalent to approximately 28.3 EH/s with current-generation miners, by the end of 2025.
Source (primary)
terawulf 8-K exhibit (exhibit991-earningsrelea.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-08)Live source ↗
Quote: “it endeavors to deploy 550 MW, equivalent to approximately 28.3 EH/s, utilizing the current generation of miners by 2025”
How we checked this
Checked on November 9, 2026. The cited source supports every part of this claim.
The release says the company endeavors to deploy 550 MW (about 28.3 EH/s with current-generation miners) by 2025, and the CEO is quoted saying the scale-up to 550 MW is planned by the conclusion of 2025.
Confirmed in the source:
- TeraWulf plans to deploy 550 MW
- 550 MW is equivalent to approximately 28.3 EH/s using current-generation miners
- The target is the end of 2025
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1083301/000108330124000066/exhibit991-earningsrelea.htm) in full (27,213 characters, retrieved November 8, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms terawulf 8-K exhibit (exhibit991-earningsrelea.htm)
Quote: “it endeavors to deploy 550 MW, equivalent to approximately 28.3 EH/s, utilizing the current generation of miners by 2025”
delays TeraWulf 10-Q filed 2026-08-05
Quote: “has energized 145 MW of capacity across three buildings and supporting infrastructure at the site”