Total operational capacity ~10 EH/s by mid-2024
Company: TeraWulf
What the later record shows
Delivered; the record does not say when
Hash rate was still about 8.0 EH/s on May 31, 2024. The track-record chart later shows 10.0 EH/s for 3Q 2024, but no passage says whether it was reached by June 30.
“As of May 31, 2024, TeraWulf's operational infrastructure capacity comprised 160 MW at the Lake Mariner facility and 50 MW at the Nautilus facility”
2024-06-03 · terawulf 8-K exhibit (wulfmay24opsreportdraft0.htm) View cached copy (2026-11-04)Live source ↗
“0.3 EH/s 2.0 EH/s 3.3 EH/s 5.5 EH/s 10.0 EH/s 9.7 EH/s 12.2 EH/s”
2025-05-08 · terawulf 8-K exhibit (wulfq12025investorpresvf.htm) View cached copy (2026-10-15)Live source ↗
Checked November 8, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
Completing Building 4 is expected to raise TeraWulf's total operational capacity to approximately 10 EH/s by mid-2024.
Source (primary)
terawulf 8-K exhibit (wulfmar24opsreport04-1x2.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-08)Live source ↗
Quote: “which is expected to increase TeraWulf's total operational capacity to approximately 10 EH/s”
How we checked this
Checked on November 9, 2026. The cited source supports every part of this claim.
The update ties Building 4's mid-2024 completion to an expected rise in total operational capacity to about 10 EH/s. The headline also describes a path to 10 EH/s by mid-2024.
Confirmed in the source:
- Completing Building 4 is expected to increase TeraWulf's total operational capacity to approximately 10 EH/s
- This is expected by mid-2024
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1083301/000108330124000082/wulfmar24opsreport04-1x2.htm) in full (9,459 characters, retrieved November 8, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms terawulf 8-K exhibit (wulfmar24opsreport04-1x2.htm)
Quote: “which is expected to increase TeraWulf's total operational capacity to approximately 10 EH/s”
confirms terawulf 8-K exhibit (wulfq12025investorpresvf.htm)
Quote: “0.3 EH/s 2.0 EH/s 3.3 EH/s 5.5 EH/s 10.0 EH/s 9.7 EH/s 12.2 EH/s”
confirms terawulf 8-K exhibit (wulfmay24opsreportdraft0.htm)
Quote: “As of May 31, 2024, TeraWulf's operational infrastructure capacity comprised 160 MW at the Lake Mariner facility and 50 MW at the Nautilus facility”