1,400MW Texas development site by late 2026
Company: IREN
The claim, verbatim
A 1,400MW development site in Texas is expected to be connected by late 2026; the grid connection is underway.
Source (primary)
iren 8-K exhibit (ef20026073_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-08)Live source ↗
Quote: “Development Site (Texas, USA) 1,400 Late 2026 Connection underway”
How we checked this
Checked on November 9, 2026. The cited source supports every part of this claim.
The capacity table lists a 1,400MW Texas development site with a 'Late 2026' timing and the status 'Connection underway'.
Confirmed in the source:
- IREN has a 1,400MW development site in Texas
- The site's timing is late 2026
- The site's connection is underway
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1878848/000114036124017811/ef20026073_ex99-1.htm) in full (16,971 characters, retrieved November 8, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms iren 8-K exhibit (ef20026073_ex99-1.htm)
Quote: “Development Site (Texas, USA) 1,400 Late 2026 Connection underway”