Planned data center capacity of 510MW by end of 2024
Company: IREN
What the later record shows
Delivered on time · happened December 31, 2024
The January 2025 update reports 510MW operating. Its data center growth chart pairs 510MW with H2 '24, which implies the target was met by end-2024. The timing comes from reading the chart and is not stated in text.
“Operating (350MW) | 21.1 EH/s Under Construction H1 2025 (300MW) H2 2025 (100MW) Grid-Connected Power Secured 510MW Operating”
2025-02-05 · iren 8-K exhibit (janmonthlyupdatevff.htm) View cached copy (2026-10-20)Live source ↗
“H1 '24 H2 '24 H1 '25 H2 '25 H1 '26 Canal Flats Mackenzie Prince George Childress (Operating) Childress (Construction) Sweetwater (Energization) 910MW 810MW 510MW 260MW”
2025-02-05 · iren 8-K exhibit (janmonthlyupdatevff.htm) View cached copy (2026-10-20)Live source ↗
Checked November 8, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
IREN has raised its planned data center capacity from 460MW to 510MW by the end of 2024.
Source (primary)
iren 8-K exhibit (ef20027927_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-08)Live source ↗
Quote: “This increases planned data center capacity from 460MW to 510MW by the end of 2024.”
How we checked this
Checked on November 9, 2026. The cited source supports every part of this claim.
The release states that the additional Childress capacity increases planned data center capacity from 460MW to 510MW by the end of 2024.
Confirmed in the source:
- IREN's planned data center capacity was previously 460MW
- IREN increased its planned data center capacity to 510MW
- The 510MW target is for the end of 2024
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1878848/000114036124022673/ef20027927_ex99-1.htm) in full (12,180 characters, retrieved November 8, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms iren 8-K exhibit (ef20027927_ex99-1.htm)
Quote: “This increases planned data center capacity from 460MW to 510MW by the end of 2024.”
confirms iren 8-K exhibit (janmonthlyupdatevff.htm)
Quote: “Operating (350MW) | 21.1 EH/s Under Construction H1 2025 (300MW) H2 2025 (100MW) Grid-Connected Power Secured 510MW Operating”