Lake Mariner HPC/AI project: initial 2 MW power block committed
Company: TeraWulf
The claim, verbatim
TeraWulf is finalizing design of a large-scale HPC/AI project at Lake Mariner, has committed an initial 2 MW block of power capable of deploying thousands of latest-generation GPUs, and has upgraded internet interconnection, designed closed-loop liquid cooling, and power supply for 100% redundancy.
Source (primary)
terawulf 8-K exhibit (wulfapr24opsreport05-2x2.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-07)Live source ↗
Quote: “the Company is finalizing the design for a large-scale, high-performance computing (HPC) / AI project at the Lake Mariner site and has committed an initial 2 MW block of power, capable of deploying thousands of the latest generation graphics processing units (GPUs)”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms terawulf 8-K exhibit (wulfapr24opsreport05-2x2.htm)
Quote: “the Company is finalizing the design for a large-scale, high-performance computing (HPC) / AI project at the Lake Mariner site and has committed an initial 2 MW block of power, capable of deploying thousands of the latest generation graphics processing units (GPUs)”