Hashrate reaching 10 EH/s in May 2024
Company: IREN
What the later record shows
Delivered; the record does not say when
The update published on 2024-07-04 and the 20-F table as of June 30, 2024 both show 10 EH/s of total operating capacity. Neither says whether this was reached in May 2024, and the figure is stated as capacity rather than measured hashrate.
“Childress Phase 1 (Texas, USA) 100 4.8 Complete Operating Total Operating 260 10”
2024-07-04 · iren 8-K exhibit (junemonthlyinvestorupdat.htm) View cached copy (2026-11-01)Live source ↗
“Childress Phase 1 (Texas, USA) 100 4.8 Operating Total Operating 260 10.0”
2024-08-27 · IREN 20-F filed 2024-08-28 View cached copy (2026-08-31)Live source ↗
Checked November 6, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
IREN had 9.4 EH/s operating and expected to reach 10 EH/s in May 2024, within the coming weeks.
Source (primary)
iren 8-K exhibit (ef20028541_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-06)Live source ↗
Quote: “9.4 EH/s operating, 10 EH/s in May”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms iren 8-K exhibit (ef20028541_ex99-1.htm)
Quote: “9.4 EH/s operating, 10 EH/s in May”
confirms IREN 20-F filed 2024-08-28
Quote: “Childress Phase 1 (Texas, USA) 100 4.8 Operating Total Operating 260 10.0”
confirms iren 8-K exhibit (junemonthlyinvestorupdat.htm)
Quote: “Childress Phase 1 (Texas, USA) 100 4.8 Complete Operating Total Operating 260 10”