Operational capacity of 210 MW and 8.0 EH/s at March 31, 2024
Company: TeraWulf
The claim, verbatim
As of March 31, 2024, TeraWulf reported a total installed hashrate of 8.0 EH/s across both sites and total operational capacity of 210 MW.
Source (primary)
terawulf 8-K exhibit (aex991xearningsreleasexq12.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-06)Live source ↗
Quote: “The total installed hashrate across both sites was 8.0 EH/s, with a total operational capacity of 210 MW”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms terawulf 8-K exhibit (aex991xearningsreleasexq12.htm)
Quote: “The total installed hashrate across both sites was 8.0 EH/s, with a total operational capacity of 210 MW”