Nearly 500 MW total HPC hosting capacity from 1.2 GW contracted power
Company: Core Scientific
The claim, verbatim
With 1.2 gigawatts of contracted power, Core Scientific states it can deliver a total of nearly 500 MW of HPC hosting infrastructure (representing 700 MW of gross infrastructure).
Source (primary)
core-scientific 8-K exhibit (ex991-finalcorzhpcoptionre.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-02)Live source ↗
Quote: “With its total of 1.2 gigawatts of contracted power, Core Scientific is able to deliver a total of nearly 500 MW of infrastructure for HPC hosting”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms core-scientific 8-K exhibit (ex991-finalcorzhpcoptionre.htm)
Quote: “With its total of 1.2 gigawatts of contracted power, Core Scientific is able to deliver a total of nearly 500 MW of infrastructure for HPC hosting”