70 MW CoreWeave capacity operational H2 2025
Company: Core Scientific
What the later record shows
Outcome not yet confirmed
Later filings only restate the expectation that the 70 MW would be operational in H2 2025. No passage confirms that the 70 MW became operational or that its date slipped.
“On track to energize 250 MW by the end of 2025 and a total of 590 MW by early 2027”
2025-10-29 · core-scientific 8-K exhibit (ef20057996_ex99-1.htm) View cached copy (2026-09-27)Live source ↗
“Operational status for the additional 70 MW is expected in the second half of 2025.”
2026-03-01 · Core Scientific 10-K/A filed 2026-03-02 View cached copy (2026-08-31)Live source ↗
Checked November 2, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
The ~70 MW of additional HPC infrastructure for CoreWeave is anticipated to reach operational status in the second half of 2025.
Source (primary)
core-scientific 8-K exhibit (ex991-finalcorzhpcoptionre.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-11-02)Live source ↗
Quote: “with operational status anticipated in the second half of 2025”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms core-scientific 8-K exhibit (ex991-finalcorzhpcoptionre.htm)
Quote: “with operational status anticipated in the second half of 2025”