The facility will draw energy from the adjacent Briscoe Wind Farm, a 150 MW wind generation source with existing grid connectivity.

Source (primary)

Soluna Holdings (NASDAQ: SLNH) And Applied Digital (NASDAQ: APLD) Partner To Build 50 MW Wind-Powered AI Data Center In Texas - Foreign Policy Journal (-, news_article)
View cached copy (2026-10-26)Live source ↗

Quote: “access to a site with a 150 MW wind generation source directly adjacent to the land, along with existing grid connectivity”

How we checked this

This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.

Additional evidence

confirms Soluna Holdings (NASDAQ: SLNH) And Applied Digital (NASDAQ: APLD) Partner To Build 50 MW Wind-Powered AI Data Center In Texas - Foreign Policy Journal

Quote: “access to a site with a 150 MW wind generation source directly adjacent to the land, along with existing grid connectivity”