Grid-connected capacity in 2025
Company: IREN
What the later record shows
Partly delivered
Operating capacity rose to 810MW by June 30, 2025. The remaining capacity (Horizon 1, 75MW) was still under construction, and no passage shows 910MW reached in 2025.
“Childress BTC Mining (Texas, USA) 650 40.1 Operating Total Operating 810 50.0 Childress Horizon 1 (Texas, USA) 75 N/A Under construction”
2025-08-27 · IREN 10-K filed 2025-08-28 View cached copy (2026-08-31)Live source ↗
Checked October 20, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
IREN has 510MW of grid connection, rising to 910MW in 2025.
Source (primary)
iren 8-K exhibit (q2fy25resultspresentatio.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-20)Live source ↗
Quote: “510MW (910MW in 2025)”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms iren 8-K exhibit (q2fy25resultspresentatio.htm)
Quote: “510MW (910MW in 2025)”