2.8 GW pipeline across 7 sites
Company: Cipher Mining
The claim, verbatim
Cipher has about 2.8 GW of future capacity across seven sites, assuming all load studies and regulatory approvals are passed.
Source (primary)
cipher-mining 8-K exhibit (exh992ciphermining_busin.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-16)Live source ↗
Quote: “2.8 GW Future Capacity at 7 Sites”
How we checked this
Checked on October 17, 2026. The cited source supports every part of this claim.
The key indicators slide shows 2.8 GW of future capacity at 7 sites. Its footnote states the load-study and regulatory-approval assumption.
Confirmed in the source:
- Cipher has about 2.8 GW of future capacity across seven sites
- The 2.8 GW figure assumes all load studies and regulatory approvals are passed
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1819989/000181998925000034/exh992ciphermining_busin.htm) in full (18,992 characters, retrieved October 16, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms cipher-mining 8-K exhibit (exh992ciphermining_busin.htm)
Quote: “2.8 GW Future Capacity at 7 Sites”