jain.com

Kentucky PSC customer protections on Muskie contract

Company: TeraWulf

Subject kind
regulatory
Statement date
2026-10-09
Promised amount
90.0 percent
Current status
stated

The claim, verbatim

The Kentucky PSC imposed protections TeraWulf must adhere to, including a 20-year minimum contract term, a 90% minimum billing floor, an early exit fee, limits on capacity reductions, and collateral equal to 24 times the previous maximum monthly non-fuel bill.

Source (primary)

TeraWulf raises Muskie campus power capacity to 1 GW in Kentucky - ET Datacenters (-, news_article)
View cached copy (2026-10-15)Live source ↗Archive.org ↗

Quote: “These include a 20-year minimum contract term and a 90 per cent minimum billing floor, even if actual use is lower. Other protections include an early exit fee, limits on capacity reductions, and collateral equal to 24 times the previous maximum monthly non-fuel bill.”

How we checked this

Checked on October 17, 2026. The cited source supports every part of this claim.

The article lists each of these Kentucky PSC-imposed protections that TeraWulf must adhere to.

Confirmed in the source:

What we did: Read our cached copy of the publisher (https://datacenters.economictimes.indiatimes.com/amp/news/energy-cooling-sustainability/terawulf-raises-muskie-campus-power-capacity-to-1-gw-in-kentucky/134830560) in full (5,488 characters, retrieved October 15, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms TeraWulf raises Muskie campus power capacity to 1 GW in Kentucky - ET Datacenters

Quote: “These include a 20-year minimum contract term and a 90 per cent minimum billing floor, even if actual use is lower. Other protections include an early exit fee, limits on capacity reductions, and collateral equal to 24 times the previous maximum monthly non-fuel bill.”

View cached copy (2026-10-15)Live source ↗Archive.org ↗