Kentucky PSC customer protections on Muskie contract
Company: TeraWulf
The claim, verbatim
The Kentucky PSC imposed protections TeraWulf must adhere to, including a 20-year minimum contract term, a 90% minimum billing floor, an early exit fee, limits on capacity reductions, and collateral equal to 24 times the previous maximum monthly non-fuel bill.
Source (primary)
TeraWulf raises Muskie campus power capacity to 1 GW in Kentucky - ET Datacenters (-, news_article)
View cached copy (2026-10-15)Live source ↗Archive.org ↗
Quote: “These include a 20-year minimum contract term and a 90 per cent minimum billing floor, even if actual use is lower. Other protections include an early exit fee, limits on capacity reductions, and collateral equal to 24 times the previous maximum monthly non-fuel bill.”
How we checked this
Checked on October 17, 2026. The cited source supports every part of this claim.
The article lists each of these Kentucky PSC-imposed protections that TeraWulf must adhere to.
Confirmed in the source:
- The Kentucky PSC imposed protections for Kentucky customers that TeraWulf must adhere to
- The protections include a 20-year minimum contract term
- The protections include a 90% minimum billing floor
- The protections include an early exit fee
- The protections include limits on capacity reductions
- The protections include collateral equal to 24 times the previous maximum monthly non-fuel bill
What we did: Read our cached copy of the publisher (https://datacenters.economictimes.indiatimes.com/amp/news/energy-cooling-sustainability/terawulf-raises-muskie-campus-power-capacity-to-1-gw-in-kentucky/134830560) in full (5,488 characters, retrieved October 15, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf raises Muskie campus power capacity to 1 GW in Kentucky - ET Datacenters
Quote: “These include a 20-year minimum contract term and a 90 per cent minimum billing floor, even if actual use is lower. Other protections include an early exit fee, limits on capacity reductions, and collateral equal to 24 times the previous maximum monthly non-fuel bill.”