Installed hashrate expanded to 40 EH/s
Company: IREN
The claim, verbatim
After March 31, 2025, IREN expanded its total installed hashrate capacity across BC and Texas from 37 EH/s to 40 EH/s.
Source (primary)
iren 8-K exhibit (irenlimited-exx994mar2025.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-15)Live source ↗
Quote: “Subsequent to March 31, 2025, we have expanded our total installed hashrate capacity across our sites in BC and Texas from 37 EH/s to 40 EH/s.”
How we checked this
Checked on October 16, 2026. The cited source supports every part of this claim.
The filing states that after March 31, 2025, installed hashrate across the BC and Texas sites rose from 37 EH/s to 40 EH/s.
Confirmed in the source:
- After March 31, 2025, IREN expanded its total installed hashrate capacity
- The expansion covered IREN's sites in BC and Texas
- Installed hashrate capacity rose from 37 EH/s to 40 EH/s
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1878848/000187884825000043/irenlimited-exx994mar2025.htm) in full (129,213 characters, retrieved October 15, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms iren 8-K exhibit (irenlimited-exx994mar2025.htm)
Quote: “Subsequent to March 31, 2025, we have expanded our total installed hashrate capacity across our sites in BC and Texas from 37 EH/s to 40 EH/s.”
