Leased capacity and controlled pipeline
Company: TeraWulf
The claim, verbatim
TeraWulf has 522 MW of leased critical IT capacity and a 2.3 GW (2,272 MW critical IT) controlled HPC pipeline across a 5-site platform.
Source (primary)
Q1 2026 Earnings Update Presentation (IR page (investors.terawulf.com), ir_presentation)
View cached copy (2026-10-13)Live source ↗Archive.org ↗
Quote: “2.3 GW HPC Portfolio | 522 MW Leased”
How we checked this
Checked on October 15, 2026. The cited source supports every part of this claim.
The presentation states 522 MW leased, a 2.3 GW controlled pipeline totaling 2,272 MW critical IT, and a 5-site platform.
Confirmed in the source:
- TeraWulf has 522 MW of leased capacity, stated as critical IT MW
- TeraWulf has a 2.3 GW controlled HPC pipeline/portfolio
- The total platform is 2,272 MW of critical IT capacity
- TeraWulf describes a 5-site diversified platform
What we did: Read our cached copy of IR page (investors.terawulf.com) (https://d1io3yog0oux5.cloudfront.net/_513c80c486e62e4bdb70115ded3782f5/terawulf/db/2396/23490/pdf/TeraWulf+Q1+2026+Investor+Presentation+%28May+2026%29.pdf) in full (27,753 characters, retrieved October 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Q1 2026 Earnings Update Presentation
Quote: “2.3 GW HPC Portfolio | 522 MW Leased”