Platform capacity outlook through 2030
Company: TeraWulf
The claim, verbatim
Leased capacity plus pipeline projected to reach ~2.9 GW by 2030, assuming 250–500 MW incremental annual signings (1.1–1.4 GW in 2027, 1.4–1.8 GW in 2028).
Source (primary)
Q2 2026 Earnings Update Presentation (IR page (investors.terawulf.com), ir_presentation)
View cached copy (2026-10-06)Live source ↗Archive.org ↗
Quote: “Platform capacity to support 250 –500 MW of annual critical IT signings”
How we checked this
Checked on October 13, 2026. The cited source supports part of this claim, but not all of it.
The chart's 2030 projection is 1.8–2.8 GW. The ~2.9 GW figure is the total of current leased capacity (839 MW) and the full controlled pipeline (2,082 MW), not a projection for 2030.
Confirmed in the source:
- Projections assume 250–500 MW of incremental critical IT signings per year
- Leased capacity plus pipeline is projected at 1.1–1.4 GW in 2027
- Leased capacity plus pipeline is projected at 1.4–1.8 GW in 2028
We could not confirm this from the cited source:
- That leased capacity plus pipeline is projected to reach ~2.9 GW by 2030
That does not mean it is false — only that this source does not establish it, as of the date above. If we find a source that settles it, we will re-check and update this page.
What we did: Read our cached copy of IR page (investors.terawulf.com) (https://d1io3yog0oux5.cloudfront.net/_26c9692236622f11a71632d61560402c/terawulf/db/2396/23522/pdf/TeraWulf+Q2+2026+Investor+Presentation.pdf) in full (28,349 characters, retrieved October 6, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Q2 2026 Earnings Update Presentation
Quote: “Platform capacity to support 250 –500 MW of annual critical IT signings”