Prior Fluidstack 360 MW contracts
Company: TeraWulf
The claim, verbatim
Abernathy JV builds on 360+ MW of critical IT load signed with Fluidstack in August 2025.
Source (primary)
Majority-Owned Joint Venture with Fluidstack for 168 MW in Texas (IR page (investors.terawulf.com), ir_release)
View cached copy (2026-10-06)Live source ↗
Quote: “Builds on 360 MW + of critical IT load signed in August 2025”
How we checked this
Checked on October 13, 2026. The cited source supports every part of this claim.
Under the 'TeraWulf and Fluidstack Partnership' heading, the document says the deal builds on 360 MW+ of critical IT load signed in August 2025.
Confirmed in the source:
- The Abernathy JV builds on 360+ MW of critical IT load
- That load was signed in August 2025
- That load was signed with Fluidstack
What we did: Read our cached copy of IR page (investors.terawulf.com) (https://d1io3yog0oux5.cloudfront.net/_26c9692236622f11a71632d61560402c/terawulf/db/2396/23305/pdf/Abernathy_JV_Announcement_Pres_Oct_2025vF.pdf) in full (7,261 characters, retrieved October 6, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Majority-Owned Joint Venture with Fluidstack for 168 MW in Texas
Quote: “Builds on 360 MW + of critical IT load signed in August 2025”