Leased capacity 522.5 MW (Core42 + Fluidstack)
Company: TeraWulf
The claim, verbatim
Leased capacity of 522.5 MW: Core42 72.5 MW in 2025 and Fluidstack 450 MW in 2026.
Source (primary)
WULF Expands Fluidstack Deal (IR page (investors.terawulf.com), ir_release)
View cached copy (2026-10-06)Live source ↗
Quote: “Leased Capacity: 522.5 MW ▪ Core42: 72.5 MW in 2025 ▪ Fluidstack: 450 MW in 2026”
How we checked this
Checked on October 13, 2026. The cited source supports every part of this claim.
The capacity slide lists leased capacity of 522.5 MW, made up of Core42 at 72.5 MW in 2025 and Fluidstack at 450 MW in 2026.
Confirmed in the source:
- Leased capacity totals 522.5 MW
- Core42 leases 72.5 MW in 2025
- Fluidstack leases 450 MW in 2026
What we did: Read our cached copy of IR page (investors.terawulf.com) (https://d1io3yog0oux5.cloudfront.net/_26c9692236622f11a71632d61560402c/terawulf/db/2396/23304/pdf/WULF_Expands_Fluidstack_Deal_August_2025.pdf) in full (11,936 characters, retrieved October 6, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms WULF Expands Fluidstack Deal
Quote: “Leased Capacity: 522.5 MW ▪ Core42: 72.5 MW in 2025 ▪ Fluidstack: 450 MW in 2026”
