Bitcoin mining capacity target 2025
Company: TeraWulf
What the later record shows
Partly delivered
Hash rate reached 11.6 EH/s at the end of Q3 2025, close to 12 EH/s. However, only about 130 MW of mining was in operation and Q4 2025 guidance was about 7.2 EH/s, so the 225 MW / 12 EH/s target was not held through Q4.
“End of Period Hash Rate 11.6 EH/s ➢ Represents a 53% increase YoY”
2025-11-09 · terawulf 8-K exhibit (wulfq32025investorupdate.htm) View cached copy (2026-09-27)Live source ↗
“HPC Colocation | 594 MW contracted1 Bitcoin Mining | ~130 MW Expect to lease 250-500 MW critical IT load of new HPC capacity per year”
2025-11-09 · terawulf 8-K exhibit (wulfq32025investorupdate.htm) View cached copy (2026-09-27)Live source ↗
Checked October 9, 2026 against filings, releases and reporting published after the claim was made. Quotes are verbatim from the linked documents.
The claim, verbatim
TeraWulf targets 225 MW and 12 EH/s of bitcoin mining capacity for Q2–Q4 2025.
Source (primary)
Investor Presentation (IR page (investors.terawulf.com), ir_presentation)
View cached copy (2026-10-06)Live source ↗
Quote: “Targeting 225 MW and 12 EH/s for Q2 – Q42025”
How we checked this
Checked on October 16, 2026. The cited source supports every part of this claim.
The presentation states a target of 225 MW and 12 EH/s for Q2–Q4 2025 and ties the 225 MW to bitcoin mining.
Confirmed in the source:
- TeraWulf targets 225 MW for Q2–Q4 2025
- TeraWulf targets 12 EH/s for Q2–Q4 2025
- The 225 MW target is for bitcoin mining (the presentation states 225 MW to be deployed for bitcoin mining in 2025)
What we did: Read our cached copy of IR page (investors.terawulf.com) (https://d1io3yog0oux5.cloudfront.net/_26c9692236622f11a71632d61560402c/terawulf/db/2396/23301/pdf/WULF_Q1_2025_Investor_Pres_vF.pdf) in full (23,307 characters, retrieved October 6, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Investor Presentation
Quote: “Targeting 225 MW and 12 EH/s for Q2 – Q42025”
confirms terawulf 8-K exhibit (wulfq12025investorpresvf.htm)
Quote: “225 MW to be deployed for bitcoin mining in 2025”
