Beacon Point and portfolio contracted capacity
Company: Hut 8 - Project: Beacon Point
The claim, verbatim
The second Beacon Point lease brings total contracted capacity at the 1 GW campus to 704 MW and Hut 8's total contracted portfolio capacity to 949 MW.
Source (primary)
HUT: Contracted AI Capacity And Credit Quality Still Outweigh Funding Risk - simplywall.st (-, news_article)
View cached copy (2026-10-03)Live source ↗
Quote: “This brings total contracted capacity at the site to 704 megawatts and contracted portfolio capacity to 949 megawatts. Source: company press release.”
How we checked this
Checked on October 5, 2026. The cited source supports every part of this claim.
The document states the second lease brings Beacon Point contracted capacity to 704 MW and portfolio contracted capacity to 949 MW, and describes the campus as 1 gigawatt.
Confirmed in the source:
- The second Beacon Point lease brings total contracted capacity at the site to 704 MW
- Beacon Point is a 1 gigawatt campus
- The lease brings Hut 8's total contracted portfolio capacity to 949 MW
What we did: Read our cached copy of the publisher (https://simplywall.st/community/narratives/us/software/nasdaq-hut/hut-8/aduf842x-future-power-capacity-and-ai-demand-will-drive-sector-leadership/updates/22-analysts-have-trimmed-the-hut-8-fair-value-estimate-by-about) in full (7,891 characters, retrieved October 3, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms HUT: Contracted AI Capacity And Credit Quality Still Outweigh Funding Risk - simplywall.st
Quote: “This brings total contracted capacity at the site to 704 megawatts and contracted portfolio capacity to 949 megawatts. Source: company press release.”