Beacon Point campus total contracted capacity
Company: Hut 8 - Project: Beacon Point
The claim, verbatim
Total contracted capacity at the 1 GW Beacon Point campus is 704 MW.
Source (primary)
HUT: Contracted AI Capacity And Credit Quality Still Outweigh Funding Risk - simplywall.st (-, news_article)
View cached copy (2026-10-03)Live source ↗
Quote: “This brings total contracted capacity at the site to 704 megawatts”
How we checked this
Checked on October 5, 2026. The cited source supports every part of this claim.
The document describes Beacon Point as a 1 gigawatt campus and says total contracted capacity at the site is 704 megawatts.
Confirmed in the source:
- Beacon Point is a 1 gigawatt campus
- Total contracted capacity at the Beacon Point site is 704 MW
What we did: Read our cached copy of the publisher (https://simplywall.st/community/narratives/us/software/nasdaq-hut/hut-8/aduf842x-future-power-capacity-and-ai-demand-will-drive-sector-leadership/updates/22-analysts-have-trimmed-the-hut-8-fair-value-estimate-by-about) in full (7,891 characters, retrieved October 3, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms HUT: Contracted AI Capacity And Credit Quality Still Outweigh Funding Risk - simplywall.st
Quote: “This brings total contracted capacity at the site to 704 megawatts”