2,000 MW queued capacity 2028+
Company: Cipher Mining
The claim, verbatim
Cipher has 2,000 MW of queued capacity (500 MW per site) for 2028 and later, pending load studies and ERCOT LFL approval.
Source (primary)
cipher-mining 8-K exhibit (dp234624_ex9902.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-01)Live source ↗
Quote: “Queued Capacity (2028+) ... 2,000 MW (2) 891 Acres ... Reflects total potential capacity of 500 MW per site – pending load studies and ERCOT LFL approval”
How we checked this
Checked on October 2, 2026. The cited source supports every part of this claim.
The capacity table lists Queued Capacity (2028+) at 2,000 MW. A footnote says this reflects 500 MW per site, pending load studies and ERCOT LFL approval.
Confirmed in the source:
- Cipher lists Queued Capacity for 2028 and later
- Queued capacity totals 2,000 MW
- The 2,000 MW reflects potential capacity of 500 MW per site
- The queued capacity is pending load studies and ERCOT LFL approval
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1819989/000095010325012168/dp234624_ex9902.htm) in full (11,050 characters, retrieved October 1, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms cipher-mining 8-K exhibit (dp234624_ex9902.htm)
Quote: “Queued Capacity (2028+) ... 2,000 MW (2) 891 Acres ... Reflects total potential capacity of 500 MW per site – pending load studies and ERCOT LFL approval”