Pro forma ~660 MW mix, ~37% AI/HPC
Company: Cipher Mining
The claim, verbatim
On a pro forma basis Cipher's capacity is ~660 MW, roughly 63% bitcoin mining and 37% AI/HPC.
Source (primary)
cipher-mining 8-K exhibit (dp234624_ex9902.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-01)Live source ↗
Quote: “Total Pro Forma MW Mix (1) BTC Mining ~63% AI/HPC ~37% ~660MW”
How we checked this
Checked on October 2, 2026. The cited source supports every part of this claim.
The presentation shows a total pro forma MW mix of ~660 MW, split ~63% BTC mining and ~37% AI/HPC, based on forecasted Barber Lake AI/HPC capacity plus currently operating self-mining sites.
Confirmed in the source:
- Cipher's total pro forma capacity is approximately 660 MW
- The pro forma mix is roughly 63% bitcoin mining
- The pro forma mix is roughly 37% AI/HPC
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1819989/000095010325012168/dp234624_ex9902.htm) in full (11,050 characters, retrieved October 1, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms cipher-mining 8-K exhibit (dp234624_ex9902.htm)
Quote: “Total Pro Forma MW Mix (1) BTC Mining ~63% AI/HPC ~37% ~660MW”