~2.4 GW HPC pipeline excluding Fluidstack
Company: Cipher Mining
The claim, verbatim
Excluding the MW contracted to Fluidstack, Cipher has a pipeline of approximately 2.4 GW being prioritized for HPC.
Source (primary)
cipher-mining 8-K exhibit (dp234624_ex9901.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-10-01)Live source ↗
Quote: “Excluding contracted MWs for Fluidstack, Cipher maintains a growing pipeline of ~2.4 GW being prioritized for HPC”
How we checked this
Checked on October 2, 2026. The cited source supports every part of this claim.
The release states that, excluding the MW contracted to Fluidstack, Cipher has a growing pipeline of about 2.4 GW being prioritized for HPC.
Confirmed in the source:
- Excluding the MW contracted to Fluidstack, Cipher has a pipeline of approximately 2.4 GW being prioritized for HPC
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1819989/000095010325012168/dp234624_ex9901.htm) in full (12,064 characters, retrieved October 1, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms cipher-mining 8-K exhibit (dp234624_ex9901.htm)
Quote: “Excluding contracted MWs for Fluidstack, Cipher maintains a growing pipeline of ~2.4 GW being prioritized for HPC”