Macerich Thousand Oaks microgrid professional services
Company: CleanSpark - Project: Thousand Oaks
The claim, verbatim
Executed professional services agreement with Macerich on October 2, 2018 for $88,250 in consultation and engineering services for microgrid at Thousand Oaks facility
Source (primary)
CleanSpark 10-K filed 2019-01-15 (SEC EDGAR, sec_filing)
View cached copy (2026-09-27)Live source ↗
Quote: “On October 2, 2018, we executed a Profession Services Agreement with Macerich to perform engineering, design and consultation services and follow-on construction work to install a Microgrid designed by our engineering team which utilized our mVSO software in creating the system design. At this time this agreement only specifically authorizes an initial $88,250 for consultation and engineering services”
How we checked this
Checked on September 29, 2026. The cited source supports every part of this claim.
The filing gives the October 2, 2018 execution date, the initial $88,250 authorization and the Thousand Oaks location.
Confirmed in the source:
- CleanSpark executed a Professional Services Agreement with Macerich on October 2, 2018
- The agreement initially authorized $88,250 for consultation and engineering services
- The microgrid is expected to be at Macerich's Thousand Oaks facility
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/827876/000166357719000036/mainbody2.htm) in full (251,181 characters, retrieved September 27, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms CleanSpark 10-K filed 2019-01-15
Quote: “On October 2, 2018, we executed a Profession Services Agreement with Macerich to perform engineering, design and consultation services and follow-on construction work to install a Microgrid designed by our engineering team which utilized our mVSO software in creating the system design. At this time this agreement only specifically authorizes an initial $88,250 for consultation and engineering services”