Macerich Professional Services Agreement
Company: CleanSpark - Project: Thousand Oaks
The claim, verbatim
CleanSpark executed Professional Services Agreement with Macerich for engineering, design, consultation and construction of microgrid at Thousand Oaks facility
Source (primary)
CleanSpark 10-K filed 2019-01-15 (SEC EDGAR, sec_filing)
View cached copy (2026-09-27)Live source ↗
Quote: “On October 2, 2018, we executed a Profession Services Agreement with Macerich to perform engineering, design and consultation services and follow-on construction work to install a Microgrid”
How we checked this
Checked on September 29, 2026. The cited source supports every part of this claim.
The filing describes the Macerich agreement's scope and the Thousand Oaks location. It notes that construction requires a separate Design Build Contract and Macerich's written authorization for each stage.
Confirmed in the source:
- On October 2, 2018 CleanSpark executed a Professional Services Agreement with Macerich
- The agreement covers engineering, design and consultation services and follow-on construction work to install a microgrid
- The microgrid is expected to be located at Macerich's Thousand Oaks, California facility
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/827876/000166357719000036/mainbody2.htm) in full (251,181 characters, retrieved September 27, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms CleanSpark 10-K filed 2019-01-15
Quote: “On October 2, 2018, we executed a Profession Services Agreement with Macerich to perform engineering, design and consultation services and follow-on construction work to install a Microgrid”