Build cost per critical MW
Company: TeraWulf
The claim, verbatim
Capital expenditure for critical IT load is expected to be $8-10 million per MW
Source (primary)
terawulf 8-K exhibit (tm2529509d1_ex99-3.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-27)Live source ↗
Quote: “Build cost $8MM – $10MM / critical MW”
How we checked this
Checked on September 29, 2026. The cited source supports every part of this claim.
The presentation gives a build cost and capex of $8-10 million per critical IT MW.
Confirmed in the source:
- Build cost/capex is expected to be $8-10 million per MW of critical IT load
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1083301/000110465925102858/tm2529509d1_ex99-3.htm) in full (7,331 characters, retrieved September 27, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms terawulf 8-K exhibit (tm2529509d1_ex99-3.htm)
Quote: “Build cost $8MM – $10MM / critical MW”