Total contracted HPC platform capacity exceeds 510 MW
Company: TeraWulf
The claim, verbatim
Following the Fluidstack transaction, TeraWulf's contracted HPC platform now exceeds 510 MW of critical IT load.
Source (primary)
terawulf 8-K exhibit (tm2529509d1_ex99-1.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-27)Live source ↗
Quote: “As a result of this transaction, TeraWulf's contracted HPC platform now exceeds 510 MW of critical IT load”
How we checked this
Checked on September 29, 2026. The cited source supports every part of this claim.
The release states that, as a result of this transaction, TeraWulf's contracted HPC platform now exceeds 510 MW of critical IT load.
Confirmed in the source:
- As a result of the Fluidstack transaction, TeraWulf's contracted HPC platform exceeds 510 MW of critical IT load
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1083301/000110465925102858/tm2529509d1_ex99-1.htm) in full (9,229 characters, retrieved September 27, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms terawulf 8-K exhibit (tm2529509d1_ex99-1.htm)
Quote: “As a result of this transaction, TeraWulf's contracted HPC platform now exceeds 510 MW of critical IT load”