Contracted power by CYE 2026
Company: Nebius
The claim, verbatim
Securing additional sites to bring total contracted power (secured land with power) to approximately 2.5 GW by end of 2026
Source (primary)
nebius 8-K exhibit (tm2530882d1_ex99-2.htm) (SEC EDGAR (8-K Ex), press_release)
View cached copy (2026-09-26)Live source ↗
Quote: “We are currently in the process of securing additional sites that would bring our total contracted power (i.e., secured land with power) to approximately 2.5GW by the end of 2026”
How we checked this
Checked on September 28, 2026. The cited source supports every part of this claim.
The letter states the plan to secure additional sites bringing contracted power, defined as secured land with power, to about 2.5 GW by end of 2026.
Confirmed in the source:
- Nebius is in the process of securing additional sites
- The additional sites would bring total contracted power to approximately 2.5 GW by end of 2026
- Contracted power is defined as secured land with power
What we did: Read our cached copy of SEC EDGAR (8-K Ex) (https://www.sec.gov/Archives/edgar/data/1513845/000110465925109806/tm2530882d1_ex99-2.htm) in full (39,078 characters, retrieved September 26, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms nebius 8-K exhibit (tm2530882d1_ex99-2.htm)
Quote: “We are currently in the process of securing additional sites that would bring our total contracted power (i.e., secured land with power) to approximately 2.5GW by the end of 2026”