ERCOT batch zero baseload classification at Texas sites
Company: CleanSpark
The claim, verbatim
Received notice of conditional classification by ERCOT for 585 MW to receive batch zero baseload designation at Texas sites
Source (primary)
CleanSpark Proposes $2.227B Senior Secured Notes to Fund Sandersville Build-Out - Unite.AI (-, news_article)
View cached copy (2026-09-20)Live source ↗
Quote: “received notice of conditional classification by ERCOT for 585 MW of contracted capacity to receive a batch zero baseload designation”
How we checked this
Checked on September 25, 2026. The cited source supports every part of this claim.
The article reports that CleanSpark received ERCOT notice of conditional classification for 585 MW to receive a batch zero baseload designation at its Texas sites.
Confirmed in the source:
- CleanSpark received notice of conditional classification by ERCOT
- The classification covers 585 MW of contracted capacity
- The designation is batch zero baseload
- The capacity is at CleanSpark's Texas sites
What we did: Read our cached copy of the publisher (https://www.unite.ai/cleanspark-proposes-2-227b-senior-secured-notes-to-fund-sandersville-build-out/) in full (9,705 characters, retrieved September 20, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms CleanSpark Proposes $2.227B Senior Secured Notes to Fund Sandersville Build-Out - Unite.AI
Quote: “received notice of conditional classification by ERCOT for 585 MW of contracted capacity to receive a batch zero baseload designation”
