2026 AI IT load capacity
Company: IREN
The claim, verbatim
IREN is targeting approximately 300 megawatts of IT load in 2026
Source (primary)
IREN Q4 adj. EPS $(0.74) misses; BTIG sees $4B ARR - scanx.trade (-, news_article)
View cached copy (2026-09-20)Live source ↗
Quote: “IREN is targeting about 300 MW of IT load in 2026”
How we checked this
Checked on September 24, 2026. The cited source supports every part of this claim.
The article states IREN is targeting about 300 MW of IT load in 2026.
Confirmed in the source:
- IREN is targeting about 300 MW of IT load in 2026
What we did: Read our cached copy of the publisher (https://scanx.trade/stock-market-news/technology/iren-leads-coreweave-ai-revenue-per-megawatt-metric/48621281) in full (23,758 characters, retrieved September 20, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms IREN Q4 adj. EPS $(0.74) misses; BTIG sees $4B ARR - scanx.trade
Quote: “IREN is targeting about 300 MW of IT load in 2026”
