Beowulf Hardin Phase I - 70 MW capacity
Company: Marathon Digital - Project: Hardin
The claim, verbatim
Phase I of Hardin facility will provide 70 megawatts capacity with estimated buildout cost of approximately $23 million
Source (primary)
Marathon Digital 10-Q/A filed 2021-05-12 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “Phase I accounts for 70 MW of the 100 MW project... The projected build out cost for Phase I is approximately $23 million, which is front loaded as the infrastructure is being built for the full 100 MW project.”
How we checked this
Checked on September 22, 2026. The cited source supports every part of this claim.
The document states Phase I is 70 MW at an estimated cost of about $23 million.
Confirmed in the source:
- Phase I of the Hardin facility accounts for 70 MW of the 100 MW project
- Projected buildout cost for Phase I is approximately $23 million
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1507605/000149315221011136/form10-qa.htm) in full (105,800 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Marathon Digital 10-Q/A filed 2021-05-12
Quote: “Phase I accounts for 70 MW of the 100 MW project... The projected build out cost for Phase I is approximately $23 million, which is front loaded as the infrastructure is being built for the full 100 MW project.”