Partner Hosting Service Contracts
Company: Applied Digital
The claim, verbatim
GMR and Bitmain have signed hosting contracts to utilize available capacity from company's planned 100MW facility
Source (primary)
Applied Digital S-1 filed 2021-08-13 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “GMR and Bitmain have entered into hosting contracts with us that will utilize the available capacity from our first planned 100MW hosting site, enabling us to pre-fill our initial site before breaking ground.”
How we checked this
Checked on September 22, 2026. The cited source supports every part of this claim.
The document states GMR and Bitmain entered hosting contracts utilizing capacity from the planned 100MW site, pre-filling it before breaking ground.
Confirmed in the source:
- GMR and Bitmain have entered into hosting contracts with Applied Blockchain
- Those contracts will utilize available capacity from the company's first planned 100MW hosting site
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1144879/000110465921105232/tm2124821d1_s1.htm) in full (345,646 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms Applied Digital S-1 filed 2021-08-13
Quote: “GMR and Bitmain have entered into hosting contracts with us that will utilize the available capacity from our first planned 100MW hosting site, enabling us to pre-fill our initial site before breaking ground.”