Nautilus bitcoin mining capacity
Company: TeraWulf - Project: Nautilus
The claim, verbatim
Nautilus Cryptomine Facility has access to up to 300 MW of bitcoin mining capacity from Susquehanna Station
Source (primary)
TeraWulf 10-K filed 2022-03-31 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “At the time of this Annual Report, the Nautilus Cryptomine Facility has access to up to 300 MW of bitcoin mining capacity from the Susquehanna Station and is expected to be the first bitcoin mining facility site that is powered by 100% "behind the meter" zero-carbon nuclear energy.”
How we checked this
Checked on September 22, 2026. The cited source supports every part of this claim.
The document states Nautilus has access to up to 300 MW from the Susquehanna Station.
Confirmed in the source:
- The Nautilus Cryptomine Facility has access to up to 300 MW of bitcoin mining capacity from the Susquehanna Station
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000110465922041168/wulf-20211231x10k.htm) in full (353,283 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf 10-K filed 2022-03-31
Quote: “At the time of this Annual Report, the Nautilus Cryptomine Facility has access to up to 300 MW of bitcoin mining capacity from the Susquehanna Station and is expected to be the first bitcoin mining facility site that is powered by 100% "behind the meter" zero-carbon nuclear energy.”