Nautilus power supply from Susquehanna Station
Company: TeraWulf - Project: Nautilus
The claim, verbatim
Nautilus Cryptomine Facility has secured zero-carbon nuclear energy from Susquehanna Station over five-year term with two successive three-year renewal options
Source (primary)
TeraWulf 10-K filed 2022-03-31 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “The Nautilus Cryptomine Facility has secured as its power supply zero-carbon nuclear energy received directly from a substation connected to the Susquehanna Station's electrical generators over a five-year term with two successive three-year renewal options.”
How we checked this
Checked on September 22, 2026. The cited source supports every part of this claim.
The document confirms the power supply term and renewal options as stated.
Confirmed in the source:
- The Nautilus Cryptomine Facility secured zero-carbon nuclear energy from the Susquehanna Station over a five-year term with two successive three-year renewal options
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000110465922041168/wulf-20211231x10k.htm) in full (353,283 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf 10-K filed 2022-03-31
Quote: “The Nautilus Cryptomine Facility has secured as its power supply zero-carbon nuclear energy received directly from a substation connected to the Susquehanna Station's electrical generators over a five-year term with two successive three-year renewal options.”