Nautilus nuclear-powered capacity access
Company: TeraWulf - Project: Nautilus
The claim, verbatim
Nautilus Cryptomine Facility has access to up to 300 MW of bitcoin mining capacity powered by 100% zero-carbon nuclear energy from Susquehanna Station
Source (primary)
TeraWulf 10-K filed 2022-03-31 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “The Nautilus Cryptomine Facility has access to up to 300 MW of bitcoin mining capacity from the Susquehanna Station and is expected to be the first bitcoin mining facility site that is powered by 100% "behind the meter" zero-carbon nuclear energy”
How we checked this
This claim has not yet been checked assertion-by-assertion against its source. It carries a cited source and quote, but the deeper check has not run. When it does, the result appears here whatever it says.
Additional evidence
confirms TeraWulf 10-K filed 2022-03-31
Quote: “The Nautilus Cryptomine Facility has access to up to 300 MW of bitcoin mining capacity from the Susquehanna Station and is expected to be the first bitcoin mining facility site that is powered by 100% "behind the meter" zero-carbon nuclear energy”