Initial electrical capacity of Nautilus Cryptomine facility
Company: TeraWulf - Project: Nautilus
The claim, verbatim
Nautilus Cryptomine facility will initially require 200 MW of electric capacity
Source (primary)
TeraWulf 8-K filed 2022-08-29 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “the Nautilus Cryptomine facility will initially require 200 MW of electric capacity”
How we checked this
Checked on September 22, 2026. The cited source supports every part of this claim.
The document states the facility will initially require 200 MW of electric capacity.
Confirmed in the source:
- The Nautilus Cryptomine facility will initially require 200 MW of electric capacity
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000108330122000029/wulf-20220829x8k.htm) in full (9,834 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf 8-K filed 2022-08-29
Quote: “the Nautilus Cryptomine facility will initially require 200 MW of electric capacity”