Nautilus Cryptomine initial electric capacity requirement
Company: TeraWulf - Project: Nautilus
The claim, verbatim
The Nautilus Cryptomine facility will initially require 200 MW of electric capacity
Source (primary)
TeraWulf 8-K filed 2023-03-24 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “the Nautilus Cryptomine facility will initially require 200 MW of electric capacity”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The 200 MW initial capacity is stated verbatim.
Confirmed in the source:
- The Nautilus Cryptomine facility will initially require 200 MW of electric capacity
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000155837023004594/wulf-20230323x8k.htm) in full (7,977 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf 8-K filed 2023-03-24
Quote: “the Nautilus Cryptomine facility will initially require 200 MW of electric capacity”