Nautilus first behind-meter nuclear bitcoin facility
Company: TeraWulf - Project: Nautilus
The claim, verbatim
Nautilus Cryptomine Facility is expected to be the first bitcoin mining facility powered by 100% behind-the-meter zero-carbon nuclear energy
Source (primary)
TeraWulf 10-K filed 2023-03-31 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “is expected to be the first bitcoin mining facility site that is powered by 100% "behind the meter" zero-carbon nuclear energy”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The document states this expectation verbatim.
Confirmed in the source:
- The Nautilus Cryptomine Facility is expected to be the first bitcoin mining facility powered by 100% behind-the-meter zero-carbon nuclear energy
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000155837023005301/wulf-20221231x10k.htm) in full (569,235 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf 10-K filed 2023-03-31
Quote: “is expected to be the first bitcoin mining facility site that is powered by 100% "behind the meter" zero-carbon nuclear energy”