Company: TeraWulf - Project: Nautilus

Subject kind
partnership
Statement date
2023-03-30
Current status
stated

The claim, verbatim

Nautilus Cryptomine Facility is joint venture between TeraWulf and Talen powered by nuclear energy from Susquehanna Station with five-year term and two successive three-year renewal options

Source (primary)

TeraWulf 10-K filed 2023-03-31 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗

Quote: “The Nautilus Cryptomine Facility is a joint venture between TeraWulf and Talen...has secured as its power supply zero-carbon nuclear energy received directly from a substation connected to the Susquehanna Station's electrical generators over a five-year term with two successive three-year renewal options”

How we checked this

Checked on September 21, 2026. The cited source supports every part of this claim.

The 10-K describes the Nautilus facility as a TeraWulf/Talen joint venture powered by nuclear energy from the Susquehanna Station over a five-year term with two successive three-year renewal options.

Confirmed in the source:

What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000155837023005301/wulf-20221231x10k.htm) in full (569,235 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.

Additional evidence

confirms TeraWulf 10-K filed 2023-03-31

Quote: “The Nautilus Cryptomine Facility is a joint venture between TeraWulf and Talen...has secured as its power supply zero-carbon nuclear energy received directly from a substation connected to the Susquehanna Station's electrical generators over a five-year term with two successive three-year renewal options”