Nautilus Cryptomine expansion option
Company: TeraWulf - Project: Nautilus
The claim, verbatim
TeraWulf has option to add additional 50 MW at Nautilus for total capacity of 100 MW
Source (primary)
TeraWulf 10-K filed 2023-03-31 (SEC EDGAR, sec_filing)
View cached copy (2026-09-13)Live source ↗
Quote: “TeraWulf has the option to add an additional 50 MW of bitcoin mining capacity, for a total of 100 MW, at the Nautilus Cryptomine Facility”
How we checked this
Checked on September 21, 2026. The cited source supports every part of this claim.
The document states verbatim TeraWulf has the option to add 50 MW for a total of 100 MW at Nautilus.
Confirmed in the source:
- TeraWulf has the option to add an additional 50 MW at the Nautilus Cryptomine Facility
- This would bring total capacity to 100 MW
What we did: Read our cached copy of SEC EDGAR (https://www.sec.gov/Archives/edgar/data/1083301/000155837023005301/wulf-20221231x10k.htm) in full (569,235 characters, retrieved September 13, 2026) and checked each assertion in the claim against it.
Additional evidence
confirms TeraWulf 10-K filed 2023-03-31
Quote: “TeraWulf has the option to add an additional 50 MW of bitcoin mining capacity, for a total of 100 MW, at the Nautilus Cryptomine Facility”